S.No |
ITEM |
BLOCK - 1 (A,B,C,D,E,F,G,H,J) |
BLOCK - 2 ( K,L ) |
BLOCK - 3 (M & N ) |
BLOCK - 3 (P & Q) |
| | |
% Completed |
% Completed |
% Completed |
% Completed |
|
1 |
Marking of Grid Lines |
85.00% |
100.00% |
100.00% |
100.00% |
|
2 |
Mass Excavation for Footings |
100.00% |
100.00% |
100.00% |
100.00% |
|
3 |
Sectioning & Trimming |
100.00% |
100.00% |
96.59% |
100.00% |
|
4 |
PCC 1:3:6 below the footings |
100.00% |
100.00% |
96.59% |
97.65% |
|
5 |
Membrane Water proofing + Bitu board - Horizontal |
100.00% |
100.00% |
100.00% |
98.18% |
|
6 |
Membrane Water proofing - Vertical & Top |
71.32% |
100.00% |
95.67% |
- |
|
7 |
Marking of Footings, Columns etc for Foundation |
82.81% |
100.00% |
96.59% |
97.44% |
|
8 |
Steel Fabrication for Footing |
84.94% |
100.00% |
100.00% |
88.46% |
|
9 |
Shuttering for Footing |
84.93% |
100.00% |
97.59% |
97.73% |
|
10 |
Concreting of Footing |
83.10% |
100.00% |
100.00% |
85.91% |
|
11 |
Column Steel works up to Grade slab |
77.83% |
100.00% |
100.00% |
64.00% |
|
12 |
Column Shuttering works up to grade slab |
75.58% |
100.00% |
92.11% |
48.50% |
|
13 |
Column Concrete works up to grade slab |
69.78% |
100.00% |
90.00% |
48.72% |
|
14 |
Back filling |
60.00% |
97.92% |
90.48% |
0.00% |
|
15 |
Casting of Grade slab |
32.33% |
84.83% |
63.86% |
0.00% |
|
16 |
Column Steel works up to Podium slab |
31.72% |
100.00% |
95.38% |
10.17% |
|
17 |
Column Shuttering works up to Podium slab |
30.31% |
100.00% |
69.77% |
0.00% |
|
18 |
Columns Concreting up to podium slab |
28.04% |
78.64% |
70.83% |
0.00% |
|
19 |
Retaining wall casting up to Grade slab |
14.94% |
100.00% |
80.72% |
0.00% |
|
20 |
Retaining wall casting up to Podium slab |
0.00% |
85.53% |
37.79% |
0.00% |
|
21 |
Shuttering for Slab |
- |
88.00% |
49.24% |
- |
|
22 |
Casting of GF Grade slab |
- |
87.50% |
64.02% |
- |
|
23 |
GF Column Marking works |
- |
65.22% |
- |
- |
|
24 |
GF Column casting works |
- |
65.22% |
- |
- |
|
Remarks : |
|
|
|
1. Total excavation for all blocks has been completed. |
|
|
|
2. Tower A, B, D, E, M & N Grade slab completed. |
|
|
|
3. 85% Footings were completed in P & Q. |
|
|
|
|
| Project Summary |
Project Type:
Residential Apartments
Location:
OMR, Chennai.
Unit Types:
2 & 3 Bedroom Apts.
Unit Sizes:
1155 - 1805 sq. ft.
Unit Cost:
Rs. 48 Lakhs onwards.
US$ 114,300 onwards.
Project Status:
Under Construction
|
|
 |
| |
 |
Purva Privileges
A first of its kind Program in the Indian Real Estate Industry.
Refer and get rewarded
With Purva Privileges you can refer a friend or a relative to us and get rewarded.
» Learn More |
 |
|